File #: 20-0516    Version: 2 Name:
Type: Consent Calendar Item Status: Agenda Ready
File created: 6/10/2020 In control: Board of Directors
On agenda: 7/28/2020 Final action:
Title: Adopt Plans and Specifications and Authorize Advertisement for Bids for the Santa Teresa Water Treatment Plant Air Wash Pipeline Replacement Project, Project No. 93764004, Contract No. C0662 (San Jose, District 7).
Attachments: 1. Attachment 1: Notice to Bidders, 2. Attachment 2: Project Delivery Process Chart, 3. Attachment 3: Location Map, 4. Attachment 4: Plans and Specifications
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Adopt Plans and Specifications and Authorize Advertisement for Bids for the Santa Teresa Water Treatment Plant Air Wash Pipeline Replacement Project, Project No. 93764004, Contract No. C0662 (San Jose, District 7).


End
RECOMMENDATION:
Recommendation
A. Adopt Plans and Specifications and Authorize Advertisement for Bids for the Santa Teresa Water Treatment Plant Air Wash Pipeline Replacement Project per the Notice to Bidders; and
B. Authorize the Designated Engineer to issue addenda, as necessary, during the bidding process.


Body
SUMMARY:
The Santa Teresa Water Treatment Plant (STWTP) is the largest of Santa Clara Valley Water District's (Valley Water) three potable water treatment plants, delivering up to 100 million gallons of water per day to retailers, businesses and residents within Valley Water's service area. The plant supplies most of South San Jose, including Almaden Valley, Blossom Valley and Santa Teresa. It also has ability to supplement the demands of Penitencia Water Treatment Plant when needed.

The objective of the STWTP Air Wash Pipeline Replacement Project (Project) is to extend the useful life and increase the reliability of the plant's water filtration system. The air wash system agitates debris on the filter media allowing the filters to be systematically cleaned in an efficient manner.

The Project scope consists of the rehabilitation, removal and replacement of the existing air wash pipelines. This includes replacement of approximately 900 LF of above-ground 12-inch stainless steel pipe, and relining of approximately 670 LF of underground 12-inch stainless steel pipe at the east and west filter basins and galleries. Staggering of this work will be necessary to maintain water production.

Relevant Prior Board Actions:
On May 28, 2019, the Board adopted Resolution 19-50 setting the time and date for a public hearing on the Engineer's Report for the subject Project.

On June 11, 2019, the Bo...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.