File #: 21-0732    Version: 1 Name:
Type: Water Utility Enterprise Item Status: Agenda Ready
File created: 6/22/2021 In control: Board of Directors
On agenda: 9/14/2021 Final action:
Title: Approve Amendment No. 5 to Agreement No. A3626A with CDM Smith Inc., to Perform Engineering Design Services During Construction for the Rinconada Water Treatment Plant (RWTP) Interim Site Restoration Project and to Provide Engineering Design Services for the RWTP Reliability Improvement Project Phases 3 - 6, Project No. 93294057, Increasing the Total Not-to-Exceed Fee by $6,120,110, for a Total Revised Not-to-Exceed Fee of $35,405,987, and Extending the Agreement Term to October 31, 2023 (Los Gatos) (District 7).
Attachments: 1. Attachment 1: Amendment No. 5
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Approve Amendment No. 5 to Agreement No. A3626A with CDM Smith Inc., to Perform Engineering Design Services During Construction for the Rinconada Water Treatment Plant (RWTP) Interim Site Restoration Project and to Provide Engineering Design Services for the RWTP Reliability Improvement Project Phases 3 - 6, Project No. 93294057, Increasing the Total Not-to-Exceed Fee by $6,120,110, for a Total Revised Not-to-Exceed Fee of $35,405,987, and Extending the Agreement Term to October 31, 2023 (Los Gatos) (District 7).


End
RECOMMENDATION:
Recommendation
Approve Amendment No. 5 to Agreement No. A3626A with CDM Smith, Inc. for Engineering Design Services During Construction for the Rinconada Water Treatment Plant (RWTP) Interim Site Restoration Project and for Engineering Design Services for the RWTP Reliability Improvement Project Phases 3- 6, Project No. 93294057, increasing the total not-to-exceed fee by $6,120,110 for a total revised not-to-exceed fee of $35,405,987 and extending the Agreement term to October 31, 2023.


Body
SUMMARY:
CDM Smith, Inc. (Consultant) prepared the original design documents for constructing the Rinconada Water Treatment Plant (RWTP) Reliability Improvement Project. Pursuant to Amendment No. 5 to the Consultant Agreement (Agreement), they will provide design services for the remaining phases of the RWTP Reliability Improvement Project. The Consultant will repackage the original plans and specifications for the remaining construction phases of the Project and prepare them for public bidding. Consultant prepared the design documents and will provide engineering support services during construction for the RWTP Interim Site Restoration Project, which the Board awarded for construction on June 22, 2021, and perform additional design services determined necessary since the original design was completed in 2015.

Project Background

RWTP was constructed in 1967 and is Valley Water's second largest ...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.