File #: 21-0863    Version: 2 Name:
Type: Consent Calendar Item Status: Agenda Ready
File created: 7/29/2021 In control: Board of Directors
On agenda: 9/14/2021 Final action:
Title: Adopt a Resolution Setting Time and Date of Public Hearing on the Engineer's Report and CEQA Exemption Determination for the Santa Teresa Water Treatment Plant Filter Media Replacement Project, Project No. 93284013, (San Jose, District 7).
Attachments: 1. Attachment 1: Resolution, 2. Attachment 2: Engineer’s Report, 3. Attachment 3: Notice of Public Hearing
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Adopt a Resolution Setting Time and Date of Public Hearing on the Engineer's Report and CEQA Exemption Determination for the Santa Teresa Water Treatment Plant Filter Media Replacement Project, Project No. 93284013, (San Jose, District 7).


End
RECOMMENDATION:
Recommendation
Adopt the Resolution SETTING TIME AND DATE OF PUBLIC HEARING ON THE ENGINEER'S REPORT AND CEQA EXEMPTION DETERMINATION FOR THE SANTA TERESA WATER TREATMENT PLANT FILTER MEDIA REPLACEMENT PROJECT, to occur on September 28, 2021, at 6:00 PM by teleconference Zoom meeting.


Body
SUMMARY:
The objective of the Santa Teresa Water Treatment Plant Filter Media Replacement Project (Project) is to extend the useful life of the treatment plant's existing filters. The Project will replace media, inlet valves, backwash valves, and other appurtenances within the filters.

Attachment 1 contains the resolution to set the time and place for the public hearing.
Engineer's Report and CEQA Exemption Determination
Section 12 of the District Act requires the Board to conduct a public hearing to consider all written and oral objections to the proposed project when: 1) the project is new construction; and 2) the project is funded by a single or joint zone of benefit. As the proposed Project meets condition number 2, staff has prepared an Engineer's Report (Attachment 2) for the purpose of public disclosure.
In addition, staff has determined that the proposed Project would be exempt from CEQA review because it qualifies for a Categorical Exemption pursuant to CEQA Guidelines section 15301; Existing Facility [Class 1 - operation, repair, maintenance, minor alteration of existing structures and facilities].
Staff is recommending that the Board set a public hearing for September 28, 2021, at 6:00 pm to hear public comments on Valley Water's Engineer's Report and CEQA exemption determination. Following the public hearing, the Board will consider the CEQA exemption determi...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.