File #: 20-0776    Version: 1 Name:
Type: Water Utility Enterprise Item Status: Agenda Ready
File created: 8/20/2020 In control: Board of Directors
On agenda: 9/8/2020 Final action:
Title: Report of Bids Received and Award of Construction Contract to Blocka Construction, Inc., for the Pacheco Pumping Plant Priority 1 Fire Alarm and Suppression System Improvements, Project No. 91214010, Contract No. C0653 (Merced County).
Attachments: 1. Attachment 1: Addenda Nos. 1, 2, 3, and 4, 2. Attachment 2: Project Delivery Process Chart, 3. Attachment 3: Map
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Report of Bids Received and Award of Construction Contract to Blocka Construction, Inc., for the Pacheco Pumping Plant Priority 1 Fire Alarm and Suppression System Improvements, Project No. 91214010, Contract No. C0653 (Merced County).


End
RECOMMENDATION:
Recommendation
A. Ratify Addenda No. 1, 2, 3, and 4 to the Contract Documents for the Pacheco Pumping Plant Priority 1 Fire Alarm and Suppression System Improvements;
B. Award the Construction Contract to Blocka Construction, Inc. in the sum of $1,571,355; and
C. Approve a contingency sum of $157,135 and authorize the Chief Executive Officer or designee to approve individual change orders up to the designated amount.


Body
SUMMARY:
The objective of the Pacheco Pumping Plant Priority 1 Fire Alarm and Suppression System Improvements (Project) is to reduce the risk of a pumping plant shutdown due to fire damage, primarily from fire originating in electrical equipment within the pumping plant building. Project work will include installation of a clean-agent fire suppression system to work in conjunction with the existing water based system; a Very Early Smoke Detection Apparatus (VESDA) smoke detection system; replacement of the existing underfloor smoke detectors; replacement of manual pull stations and heat detectors; installation of a new fire department standpipe connection; and retrofit of the fire hose nozzles.

Addenda Ratification

Four addenda (Attachment 1) were issued during the bid period to clarify the Project Contract Documents. Staff recommends that the Board ratify the addenda to formally incorporate the changes into the Project Contract Documents.

Contract Award

A report of bids received at the bid opening for the Project on August 5, 2020 is summarized in Table 1. The apparent low bid was submitted by Blocka Construction, Inc., and they were the only firm submitting a bid for this Project.

The bid submitted by Blocka Construction, Inc. is appro...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.