File #: 23-0066    Version: 1 Name:
Type: Time Certain Item Status: Agenda Ready
File created: 1/5/2023 In control: Board of Directors
On agenda: 1/10/2023 Final action:
Title: Work Study Session on the Capital Improvement Program's Preliminary Fiscal Year 2024-2028 Five-Year Plan; Preliminary Fiscal Year 2023-24 Groundwater Production Charges; and Proposed Adjustments and Modifications to the Safe, Clean Water and Natural Flood Protection Program.
Attachments: 1. Attachment 1: CIP Preliminary FY 2024-28 Five-Year Plan, 2. Attachment 2: Project Plan Updates, 3. Attachment 3: Funding Filters for Prioritization Matrix, 4. Attachment 4: Proposed Adjustments and Modifications, 5. Attachment 5: Resolution No. 99-21, 6. Attachment 6: Resolution No. 12-10, 7. Attachment 7: Draft Public Hearing Notice, 8. *Supplemental Agenda Memo, 9. *Supplemental Attachment 1: PowerPoint
BOARD AGENDA MEMORANDUM


SUBJECT:Title
Work Study Session on the Capital Improvement Program's Preliminary Fiscal Year 2024-2028 Five-Year Plan; Preliminary Fiscal Year 2023-24 Groundwater Production Charges; and Proposed Adjustments and Modifications to the Safe, Clean Water and Natural Flood Protection Program.


End
RECOMMENDATION:Recommendation
A. Review and approve the Capital Improvement Program's (CIP) Preliminary Fiscal Year 2024-2028 (FY 24-28) Five-Year Plan list of projects for the Watershed Stream Stewardship Fund (Fund 12) and the Water Utility Enterprise Fund (Fund 61);
B. Review and approve the CIP Evaluation Team's recommendation to include the RWTP Ammonia Storage & Metering Facility Upgrade Project, a Fund 61 project, in the CIP's Draft FY 24-28 Five-Year Plan;
C. Review proposed adjustments and modifications to the Safe, Clean Water and Natural Flood Protection Program (Safe, Clean Water Program) Fund (Fund 26);
D. Set the time and place for a public hearing to consider modifications to the Safe, Clean Water Program (Fund 26) Projects; and
E. Discuss and provide direction on the preliminary FY 2023-24 (FY 24) Groundwater Production Charge analysis.


Body
SUMMARY:
This Work Study Session combines, for Board review, the CIP's Preliminary FY 24-28 Five-Year Plan list of projects with their estimated costs and proposed funding (Attachment 1), and the preliminary FY 24 groundwater production charge analysis.

As a result of project cost increases that have occurred since the Board adopted the CIP's FY 2023-27 (FY 23-27) Five-Year Plan, as detailed in the Project Plan Updates (Attachment 2), staff has prepared funding scenarios for Fund 12 and Fund 26 projects in order to ensure the financial health of both funds. The scenarios for Fund 26 trigger the Safe, Clean Water Program's Change Control Process, which includes conducting a public hearing when key performance indicators (KPIs) for an impacted project are modified. Due to proposed revise...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.