Title: Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the John D. Morgan Park Monitoring Wells Project, Project No. 91304001, Contract No. C0620 (Campbell) (District 4).
Attachments: 1. Attachment 1: Notice to Bidders, 2. Attachment 2: Project Delivery Process
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the John D. Morgan Park Monitoring Wells Project, Project No. 91304001, Contract No. C0620 (Campbell) (District 4).


End
RECOMMENDATION:
Recommendation
A. Adopt the plans and specifications and authorize advertisement for bids for the construction of the John D. Morgan Park Monitoring Wells Project per the Notice to Bidders; and

B. Authorize the Designated Engineer to issue addenda, as necessary, during bidding.


Body
SUMMARY:
The objectives of the John D. Morgan Park Monitoring Wells Project (Project) are to construct up to five monitoring wells to support the Expedited Purified Water Program, which includes potential indirect potable reuse (IPR) using purified water in the Los Gatos recharge ponds. The proposed Project will facilitate groundwater monitoring needed to satisfy state permitting requirements for IPR projects.

Project Background

The Project is located in the parking lot of the City of Campbell's (City) John D. Morgan Park. Work includes drilling two borings to a maximum depth of approximately 400 feet, retrieving soil cores for analysis, and constructing up to five monitoring wells at various depths in the two borings. To comply with the City's noise ordinance, a temporary sound wall will be constructed. The Project also includes parking lot restriping and resurfacing following completion of drilling.

This monitoring well construction work was originally to be completed as a part of a consultant agreement with Todd Groundwater for IPR groundwater studies. It was later determined that monitoring well construction and related site preparation and restoration work constitutes a public works project which requires competitive bidding. The consultant agreement with Todd Groundwater has been amended accordingly to remove this scope.

Relevant Prior Board Action(s)

On April 28, 2015, the Board authorized the CEO...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.