Title
Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the Coyote Creek Levee Rodent Damage Repair Downstream of SR 237, Project No. 62084001, Task No. 5171, Contract No. C0637 (Milpitas) (District 3).


End
RECOMMENDATION:
Recommendation
A. Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the Coyote Creek Levee Rodent Damage Repair Downstream of SR 237 Project (Project), per the Notice to Bidders; and
B. Authorize the Designated Engineer to issue addenda, as necessary, during bidding.


Body
SUMMARY:
Staff has identified a need to proceed with approximately 30 erosion repair projects from FY2018 through FY2022. One of the higher priority projects is the U.S. Army Corps of Engineers (USACE) levee at Coyote Creek, downstream of SR 237 (Project Location Map, Attachment 2) within the City of Milpitas (City).

Annually, USACE staff inspects the Coyote Creek Levee to assess the condition of the levees to determine if corrective work is required to ensure the integrity of the levees. Based on inspections, USACE ranked this portion of the levee as "Minimally Acceptable" with a recommendation to address the burrowing animal damage to the levee. Despite implementation of a long-term burrowing animal abatement program, animal burrows continue to persist throughout the levee embankment's landside and riverside slopes along the entire length of the creek. If left unabated, the current condition may induce levee failure by sloughing, slumping, and/or piping through the levee during high storm events. To maintain this certified levee within the "Acceptable" ranking from the USACE inspection, construction of this Project is proposed this year.

This Project will: A) repair damage to the levees due to burrowing animals along the most critical areas where a substantial number of holes have emerged within the levees immediately downstream of SR 237; B) reduce...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.