File #: 18-0464    Version: 1 Name:
Type: Water Utility Enterprise Item Status: Agenda Ready
File created: 6/1/2018 In control: Board of Directors
On agenda: 7/10/2018 Final action:
Title: Notice of Completion of Contract and Acceptance of Work for the Penitencia Delivery Main and Penitencia Force Main Seismic Retrofit Project, Ranger Pipelines, Inc., Contractor, Project Nos. 94384002 and 92224001, Contract No. C0611 (San Jose) (District 3).
Attachments: 1. Attachment 5: Project Delivery Process Chart, 2. Attachment 1: Notice of Completion and Acceptance of Work, 3. Attachment 2: Construction Contract Acceptance, 4. Attachment 3: Project Completion Letter, 5. Attachment 4: PowerPoint
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Notice of Completion of Contract and Acceptance of Work for the Penitencia Delivery Main and Penitencia Force Main Seismic Retrofit Project, Ranger Pipelines, Inc., Contractor, Project Nos. 94384002 and 92224001, Contract No. C0611 (San Jose) (District 3).


End
RECOMMENDATION:
Recommendation
A. Accept the work as complete; and

B. Direct the Clerk of the Board to sign the Notice of Completion of Contract and Acceptance of Work, and submit for recording to the Santa Clara County Clerk-Recorder.


Body
SUMMARY:
The construction contractor, Ranger Pipelines, Inc., has completed the Penitencia Delivery Main and Penitencia Force Main Seismic Retrofit Project (Project). The construction contract was awarded in the amount of $21,535,025 and the final contract amount is $22,833,950.70. Subject to any withholds required by law or the contract, acceptance of the work by the Board will allow for the release of $1,141,698 in retention to the contractor.

Project Background

The objective of the Project was to reduce the potential damage to, and post-earthquake recovery time of, the pipelines and the associated vault structures. The site is located on a slow-moving landslide known as the Penitencia Creek Landslide. Furthermore, the Hayward Fault runs in a northwest to southeast direction approximately 1.2 miles to the east of the site. During the past 40 years of operation, the slow creep of the landslide has impacted the structural integrity of the three pipelines.

The Project included replacement of approximately 865 lineal feet of each of three pipelines - the 66-inch diameter Penitencia Force Main, the 60-inch diameter Penitencia Delivery Main, and the 72-inch diameter South Bay Aqueduct, currently conveying raw and treated water to and from the Penitencia Water Treatment Plant with earthquake-resistant pipes. The Project also included installation of a new flowmeter, a new control building, and several pipeline vaults.

Ph...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.