File #: 19-0293    Version: 1 Name:
Type: Consent Calendar Item Status: Agenda Ready
File created: 3/7/2019 In control: Board of Directors
On agenda: 4/9/2019 Final action:
Title: Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the Uvas Creek Levee Rehabilitation Project Phase 2, Project No. 62084001, Task No. 5175, Contract No. C0648, (Gilroy) (District 1).
Attachments: 1. Attachment 1: Project Location Map, 2. Attachment 2: Notice to Bidders, 3. Attachment 3: Project Delivery Process Chart
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the Uvas Creek Levee Rehabilitation Project Phase 2, Project No. 62084001, Task No. 5175, Contract No. C0648, (Gilroy) (District 1).


End
RECOMMENDATION:
Recommendation
A. Adopt Plans and Specifications and Authorize Advertisement for Bids for Construction of the Uvas Creek Levee Rehabilitation Project Phase 2 per the Notice to Bidders; and
B. Authorize the Designated Engineer to issue addenda, as necessary, during the bidding process.


Body
SUMMARY:
Background and Project Description

During FY2018, the Watersheds Operations and Maintenance Division requested Watersheds Design and Construction Division to address the levee erosion caused by squirrels which burrowed holes along the levee slopes at Uvas Creek. Despite implementation of a long-term burrowing animal abatement program, animal burrows continue to persist throughout the levee's landside and riverside slopes along the entire length of the creek. If left unabated, the current condition could cause levee failure by sloughing, slumping, and/or piping through the levee during high storm events. To maintain the U.S. Army Corps of Engineers' "Acceptable" ranking for a certified levee, construction for Phase 2 of this Project is proposed for this year. The Phase 1 construction, which started in September 2018, is scheduled to be completed by May 2019. Phase 1 addresses levee conditions for the outboard slope of the levee, while Phase 2 addresses the inboard slope of the levee (Attachment 1).

This levee restoration project is being performed separately for the inboard slope and outboard slope phases, since California Department of Fish and Wildlife (CDFW) is claiming jurisdictional rights to the inboard slope of the levee (Phase 2) and has required the District to obtain a Streambed Alteration Agreement (SAA). To remain in good faith with the project construction sched...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.