File #: 20-0544    Version: 1 Name:
Type: Time Certain Item Status: Agenda Ready
File created: 6/18/2020 In control: Board of Directors
On agenda: 6/23/2020 Final action:
Title: Public Hearing on the Engineer's Report and the CEQA Emergency Exemption Determination for the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project; Resolution Approving the Engineer's Report; and Project Approval for the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project, Project No. 91864005 (Morgan Hill) (District 1).
Sponsors: Michelle Meredith
Attachments: 1. Attachment 1: Project Description, 2. Attachment 2: Draft Notice of Exemption, 3. Attachment 3: Engineer's Report, 4. Attachment 4: Notice of Public Hearing, 5. Attachment 5: Sierra Club Letter and Response, 6. Attachment 6: Resolution, 7. Attachment 7: PowerPoint, 8. *Supplemental Board Agenda Memo, 9. *Supplemental Attachment 1: Revised Project Description, 10. *Supplemental Attachment 2: Revised Draft Notice of Exemption, 11. *Supplemental Attachment 3: Revised PowerPoint, 12. *Handout 2.7-A, K. Irvin, 13. *Handout 2.7-B, E. Ruder, 14. *Handout 2.7-C, A. Kaewphokha, 15. *Handout 2.7-D, C. Hakes (Responding to K. Irvin, Handout 2.7-A), 16. *Handout 2.7-E, G. Pugh, 17. *Handout 2.7-F, J. Fioretta
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Public Hearing on the Engineer's Report and the CEQA Emergency Exemption Determination for the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project; Resolution Approving the Engineer's Report; and Project Approval for the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project, Project No. 91864005 (Morgan Hill) (District 1).


End
RECOMMENDATION:
Recommendation
A. Conduct Public Hearing on the Engineer's Report and the CEQA Emergency Exemption Determination for the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project (FOCP);
B. Close the Public Hearing;
C. Approve the CEQA emergency exemption determination for the FOCP;
D. Adopt the Resolution APPROVING THE ENGINEER'S REPORT FOR THE FOCP; and
E. Approve the Project.


Body
SUMMARY:
The Anderson Dam FOCP is being proposed to comply with an Order from the Federal Energy Regulatory Commission (FERC), which requires Santa Clara Valley Water District's (Valley Water) immediate implementation of interim risk reduction measures to protect the public from risk of dam failure due to seismic activity. The proposed FOCP would ensure compliance with the FERC Order by (a) allowing Valley Water to safely, reliably, and expeditiously drawdown Anderson Reservoir (Reservoir) level and maintain the Reservoir level at a required lower elevation; (b) minimizing risks associated with exceeding the restricted Reservoir level and an undersized outlet structure by constructing a new, low-level outlet; (c) prioritizing the interim downstream protection of residents and property; and (d) minimizing the public health and safety and environmental impacts of Reservoir drawdown.

I. Background

Anderson Dam was built in 1950 three miles east of U.S. 101 in the City of Morgan Hill. The dam is an earthen dam that is 235-feet high and sits along the Coyote Creek Fault as well as is parallel to the Calaveras Fault. Anderson Dam forms And...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.