Title: Report of Bids Received and Award of Construction Contract to Flatiron West Inc. in the sum of $161,140,321 for the Anderson Dam Tunnel Project, Project No. 91864005, Contract No. C0663 (Morgan Hill) (District 1).
Attachments: 1. Attachment 1: Project Delivery Process Chart, 2. Attachment 2: Location Map, 3. Attachment 3: FERC Letter, 4. Attachment 4: DSOD Letter, 5. Attachment 5: Prequalification Application, 6. Attachment 6: Notice to Bidders, 7. Attachment 7: Instructions to Bidders, 8. Attachment 8: Final Prequalified Contractors List, 9. Attachment 9: Prequalified Contractor Information, 10. Attachment 10: Flatiron Bid Proposal, 11. Attachment 11: Kiewit Bid Proposal, 12. Attachment 12: Dragados Bid Proposal, 13. Attachment 13: Bid Summary, 14. Attachment 14: Best Value Bid Summary, 15. Attachment 15: Kiewit Bid Protest, 16. Attachment 16: Response Letter to Kiewit Bid Protest, 17. Attachment 17: Flatiron CA SOS Entity Detail, 18. Attachment 18: Flatiron CA SOS SDFC, 19. Attachment 19: Flatiron CSLB Information, 20. Attachment 20: Dragados CA SOS Entity Detail, 21. Attachment 21: Dragados CA SOS SDFC, 22. Attachment 22: Dragados CSLB Information, 23. Attachment 23: Obayashi CA SOS Entity Detail, 24. Attachment 24: Obayashi Corporation CA SOS Amended SFC, 25. Attachment 25: Obayashi CSLB Information, 26. *Handout 7.3-A: J. Howard, 27. *Handout 7.3-B: Scott
BOARD AGENDA MEMORANDUM


SUBJECT:
Title
Report of Bids Received and Award of Construction Contract to Flatiron West Inc. in the sum of $161,140,321 for the Anderson Dam Tunnel Project, Project No. 91864005, Contract No. C0663 (Morgan Hill) (District 1).


End
RECOMMENDATION:
Recommendation
A. Ratify Addenda Nos. 1, 2, 3, 4, 5, 6, 7 and 8 to the Contract Documents for the Anderson Dam Tunnel Project;
B. Deny the April 5, 2021 bid protest submitted by Kiewit Infrastructure West, Inc., consistent with the Designated Engineer's April 15, 2021 final decision;
C. Award the Contract to Flatiron West Inc., located in Benicia California, in the sum of $161,140,321: and
D. Approve a contingency sum of $40,000,000 and authorize the Chief Executive Officer (CEO) or designee to approve individual change orders up to the designated amount.


Body
SUMMARY:
Board approval of these recommendations will allow the Anderson Dam Tunnel Project to be constructed. If the construction Contract is awarded, it will create and sustain approximately 1,400-2,800 jobs for the community.

Project Background

The Anderson Dam Seismic Retrofit Project (ADSRP) will correct dam seismic deficiencies and meet all current Federal Energy Regulatory Commission (FERC) and California Department of Water Resources, Division of Safety of Dams (DSOD) dam safety design standards.

Santa Clara Valley Water District (Valley Water) is undertaking the Anderson Dam Federal Energy Regulatory Commission Order Compliance Project (FOCP) as a result of the February 20, 2020 directive from FERC to implement interim risk reduction measures at Anderson Dam. One of those measures is the Anderson Dam Tunnel Project (ADTP).

The ADTP will construct a diversion system to augment the existing outlet, which will consist of a new diversion tunnel, an outlet structure, a micro-tunnel lake tap, and modifications to Coyote Creek just downstream of the base of the dam. The ADTP also includes reservoir bank and rim stability ...

Click here for full text



Notice to Public:

The Santa Clara Valley Water District publishes meeting agendas two Fridays prior to regular meetings, and publishes amended and special meeting agendas one Friday prior. During the process of amending an agenda, individual links to Board Agenda Reports may not be available. In these cases, please reference the “Full Agenda Package” instead.